31.5 MWp Barth, Germany, 2012
This 31.5 MWp solar PV project in Barth, Germany, was connected to the grid by the end of 2012 and was built in about 2 months. The solar installation was built on a former military airfield of about 40 hectares on the Baltic Sea. The military land was contaminated with warfare materials and re-used for a good purpose. SunEnergy Europe GmbH, partner of WEnergy Global Pte Ltd, was responsible for project development, planning and design.